Neubaustrecke Fulda–Gerstungen
Planned- Length
- 75 km
- Max Speed
- 300 km/h
- Responsible
- DB InfraGO AG
- Corridor
- Frankfurt–Erfurt
Travel Time Impact
Fulda Hbf → Erfurt Hbf
Before
65 min
After
35 min
Timeline
Jan. 2016
Project StartTarget completion: Dez. 2045Vordringlicher Bedarf mit EngpassbeseitigungsfunktionDez. 2030 (projected)
Route SelectedTarget completion: Dez. 2045Dez. 2045 (projected)
CompletedTarget completion: Dez. 2045A planned new high-speed line replacing the existing curvy Fulda–Gerstungen corridor through the Werra valley, which currently limits trains to around 160 km/h due to its winding alignment through hilly terrain. The new line would allow speeds of 300 km/h and dramatically reduce travel times on the Frankfurt–Erfurt axis. It is classified in the Bundesverkehrswegeplan 2030 as Vordringlicher Bedarf and complements the parallel capacity upgrades of the existing route under the ABS Hanau–Würzburg/Fulda–Erfurt project.
Official Links
Last updated: 2025-04-01