Ausbaustrecke Emmerich–Oberhausen (Betuwe-Linie)
Under Construction- Length
- 73 km
- Max Speed
- 160 km/h
- Cost
- 1.8 bn EUR
- Responsible
- DB InfraGO AG
- Corridor
- Rotterdam–Genua
Timeline
Jan. 2007
Project StartTarget completion: Dez. 2020Juni 2016
Construction StartTarget completion: Dez. 2024Dez. 2030 (projected)
CompletedTarget completion: Dez. 2030Delayed from original 2024 targetThe German continuation of the Dutch Betuwe freight corridor, upgrading the 73 km line between Emmerich (Dutch border) and Oberhausen to three tracks with ETCS signalling. A critical bottleneck on the Rhine-Alpine TEN-T corridor for European freight traffic. Completion has shifted from 2024 to approximately 2030.