← Back to mapNeubaustrecke
Brenner-Nordzulauf (Inntal-Zulauf DE)
Planned- Length
- 54 km
- Max Speed
- 230 km/h
- Cost
- 7.0 bn EUR
- Responsible
- DB InfraGO AG
- Corridor
- München–Innsbruck
Travel Time Impact
München Hbf → Innsbruck Hbf
Before
105 min
After
55 min
Timeline
Jan. 2018
Project StartTarget completion: Dez. 2040Juli 2023
Route SelectedTrasse über Inntal-Tunnel und RohrdorfDez. 2028 (projected)
PlanfeststellungTarget completion: Dez. 2040The German approach route to the Brenner Base Tunnel, connecting München with the Austrian border near Kufstein via a new 54 km line including long tunnels through the Inntal. Essential for unlocking the capacity of the Brenner Base Tunnel (under construction, AT/IT). The preferred route was selected in 2023 after years of regional consultation.